S E A W I N G

Reds Agile ESP System

Overview

The new-generation ESP: Get more from your reservoir

Because the Reda™ Agile™ compact wide-range ESP system is as short as 25 ft—which is about 75% shorter than conventional ESP systems—you can install it faster and farther into your well to get closer to the producing zones. That proximity substantially improves the drawdown potential for increasing recovery.

And production optimization continues with easy adjustment of the motor speed across its wide operating range to match production changes—eliminating the usual frequent ESP changeout. This unmatched capability is particularly useful in mature wells with steep production decline and operations with fluid variation, such as enhanced oil recovery (EOR) programs.

Applications
  • Conventional onshore and offshore oil wells
  • Wells with production variation from reservoir pressure changes (e.g., mature fields and EOR projects)
  • Wells with high dogleg severity, restricted diameter, or other intervention constraints
Benefits

A high-performance ESP means high-performing production

From installation through operation, the Agile ESP system delivers superior performance and results in comparison with conventional ESPs.

Features
  • Short 25-ft [7.6-m] length
  • Wide operational range up to 10,000 rpm
  • Field-proven induction motor (IM) technology
  • Plug-and-play installation capability
  • Compatibility with most surface equipment and downhole cables